Pilot Program Qualification

Get Your 90-Day Impact Projection & Pilot Fit Check

If recycling contamination is forcing your team to choose between “recycle more” and “keep it clean,” this pilot is built for you. The Topper Stopper™ is designed for high-traffic environments where education alone cannot prevent contamination.

Complete the short qualification form to receive:

  • A 90-day projection based on your venue type, estimated traffic, and deployment size
  • Recommended pilot placement zones to maximize capture and reduce contamination risk
  • A clear outline of what a 10-unit, 90-day pilot includes and what success looks like

Environmental impact figures are estimated potential savings calculated using EPA WARM methodology and the material counts from audited collection data.

Most submissions take 2 to 4 minutes. A team member will follow up within 1 business day.

After you submit, we will email your preliminary projection and schedule a 15-minute site fit call.

Want to see the methodology first? View the Case Study: USC Upstate Pilot Soft-Launch

What is your primary goal for this pilot?

Are you interested in the "Start with 10" Pilot (10 units for 90 days)?

Examples: "Main terminal food court" or "Student Union"

8 + 6 =

Final Weekend

Sale

25% OFF

Selected ss16 Lines

Recycle Smart Monitoring System™

The Recycle Smart Monitoring System™ (RSMS) provides a method to measure the fullness of a recycling bins. The Topper Stopper™ units equipped with RSMS determine the depth of an empty bin, then check the bin depth at specified intervals. Notifications are sent out via text message and/or email when bins reach a specified level of fullness. This works on varying sizes of bins because the system obtains the depth each time a bin is emptied (or replaced).